Build a Power Economics Brief for Sales
A power economics brief gives your sales team a defensible answer when a prospect asks what power will really cost, who funds upgrades, and what could change before turn-up. It should be a working commercial document, not a rate-sheet appendix or an engineering memo nobody can explain on a call.
For a long time, many colo sales conversations treated electricity as a pass-through detail. That approach is getting weaker. Buyers still care about price, of course, but they increasingly want to know the exposure behind the price: utility construction, deposits, load commitments, market volatility, and the conditions attached to a claimed delivery date.
Why is a simple power-rate answer no longer enough?
Because the number on a proposal is rarely the full commercial story.
A prospect evaluating a new deployment may ask for a blended power price. But once the deal reaches technical validation, procurement, or a CFO who has seen a project slip, the questions change quickly:
- Is this an existing service arrangement or one that depends on a utility upgrade?
- Are network, substation, or dedicated-facility costs included, passed through, or still unknown?
- What minimum load or contract term does the utility require?
- Can the rate change with wholesale markets, fuel, congestion, or regulatory action?
- If our deployment schedule moves, what happens to reserved capacity and deposits?
Those are not edge-case questions anymore. Duke Energy’s proposed North Carolina settlement, for example, includes nonrefundable upfront payments for dedicated facilities and deposits or security for shared upgrades. It would apply to certain new large-load customers with service agreements after June 1, 2026, if approved (Duke Energy).
Your facility may not be in Duke territory, and your customer may not trigger those exact terms. That isn’t the point. The direction is clear: utilities and regulators are looking for ways to ensure large new loads carry more of the costs and risks they create. Sales needs language for that reality before a buyer finds it in a utility filing or asks their energy adviser.
What belongs in the brief?
Keep it short enough that an account executive will use it, but specific enough that your power, finance, and legal teams recognize it as accurate. In practice, two pages plus a controlled appendix is often more useful than a polished twenty-page deck.
Start with the service fact pattern. State the currently contracted or delivered capacity at the site, the capacity subject to a defined upgrade, and the capacity that remains prospective. Use plain labels. “Available now,” “available after utility work,” and “subject to future utility approval” are much better than collapsing everything into a large headline number.
Then describe the commercial structure behind the electricity bill:
- the rate type and what is included in it;
- known pass-through charges and escalation mechanisms;
- customer-funded or operator-funded infrastructure requirements;
- deposits, minimums, take-or-pay obligations, or security provisions that could matter;
- the owner of each approval, construction milestone, and operational handoff.
The brief should also carry an explicit assumptions box. If the customer’s price assumes a load factor, a phased ramp, a particular voltage, or a contract term, say so. That detail can feel less marketable in an early presentation. Honestly, hiding it creates a much worse problem later, when procurement treats a conditional indication as a firm commitment.
How should sales discuss wholesale-price exposure?
Don’t pretend every customer needs an energy-market tutorial. They don’t. But your team should know whether a quoted structure is insulated from market movement, partly indexed, or exposed through pass-throughs.
The Energy Information Administration’s October outlook forecasts average wholesale prices across its tracked hubs at $52/MWh in 2026, above 2025, and projects PJM prices to rise more sharply year over year than any other tracked region (EIA). That does not tell you what any individual colo customer will pay. It does mean a vague “power is competitively priced here” claim is unlikely to survive serious buyer review.
Give sales three approved ways to explain your model:
- What is fixed. For example, identify the elements fixed for the quoted term, if any, and the conditions that preserve that treatment.
- What moves. Name the pass-through categories rather than burying them in a footnote. If they are indexed, explain the index and cadence.
- What you can model. Offer a customer-specific cost model once the buyer shares expected load shape, deployment sequence, and contract requirements.
That third point is important. A credible model is more valuable than a false promise of certainty. It also draws out the deal information your team needs: whether the buyer expects a flat load, a rapid ramp, redundant feeds, or the right to delay deployment.
Who should approve the claims your team makes?
The power economics brief needs a named owner, usually a commercial operations leader or a sales engineer with authority to convene the right people. But it should be reviewed by power procurement, finance, legal, construction, and the utility-facing team.
Why so many people? Because each sees a different way a deal can go wrong. Power procurement can spot an invalid tariff assumption. Construction knows whether a substation scope has actually been released. Legal will catch language that accidentally turns an estimate into a guarantee. Finance knows whether a customer contribution is already reflected in the proposal.
Set a review cadence and version date. When a utility agreement changes, a regulator opens a proceeding, or a material construction milestone moves, revise the brief and alert active deal teams. Stale enablement is worse than no enablement because it gives a rep confidence they haven’t earned.
This is especially relevant when an operator is marketing future expansion. TeraWulf recently said an amended agreement expanded contracted service at its Muskie campus and moved a planned second phase forward, while noting that the timing remains subject to Kentucky Public Service Commission approval and the utility’s construction schedule (TeraWulf’s SEC filing). The useful lesson for sales teams is not to borrow that project’s language. It is to separate the commercial agreement from the remaining conditions every time.
How do you use it without slowing a deal down?
Use the brief in stages. On the first call, sales needs only a clear headline: current capacity, likely delivery path, and the broad pricing structure. Once the buyer confirms a real requirement, share the relevant assumptions and bring in a power or engineering lead.
At proposal stage, attach the assumptions page or incorporate it directly into the commercial schedule. Don’t make the buyer hunt through technical appendices to understand what the rate excludes. If there is a dedicated infrastructure decision ahead, show the decision gate, responsible party, and what must happen before the quoted in-service date becomes firm.
For strategic accounts, turn the brief into a deal-specific risk register. List each unresolved item, its next owner, the evidence needed to close it, and the date it affects. This helps the sales leader forecast honestly and stops late-stage surprises from being treated as “technical issues” after commercial expectations have already been set.
Common questions
Do we need to disclose every utility cost detail in an early proposal?
No. Early-stage prospects do not need your full utility agreement. They do need to understand whether the price is indicative or firm, what major assumptions support it, and which costs could be customer-specific.
What if our utility has not finalized upgrade costs yet?
Say that directly and avoid presenting an estimate as a settled number. Give the buyer a range only if your internal teams approve it, explain what drives the final result, and identify the next milestone that will narrow uncertainty.
Should sales talk about regulatory risk at all?
Yes, when it can affect price, timing, or customer obligations. The goal is not to make sales staff sound like regulatory lawyers; it is to prevent a buyer from learning a material condition after they believe they have selected your site.
Can this brief help us compete against a bigger operator?
Often, yes. Larger competitors may have bigger capacity headlines, but a mid-market operator that can explain commercial conditions plainly can look far easier to buy from. Clarity is particularly persuasive when the buyer is comparing multiple sites with different utility paths.
What to do with this
Build one current brief for each market, then require it for any proposal involving a meaningful power commitment or utility-dependent expansion. Test it with the people who lose deals at the last mile: sales engineers, procurement, legal, and the account executives handling active negotiations.